Question

Click the Exhibit button. You are beginning the process of replacing Cisco switches at the distribution layer of your network with HP A-Series switches. Management has requested that network downtime must be kept to an absolute minimum. Your migration plan is to connect the A-Series switches in parallel with the distribution switches, as shown in the exhibit. The A-Series switches will assume all routing functionality at the distribution layer, which configuration change should you complete first on the Cisco switches?

Options

  • AMigrate Rapid Per-VLAN Spanning Tree Plus (Rapid PVST+) to Multiple Spanning Tree Protocol (MSTP)
  • BMigrate Enhanced Interior Gateway Routing Protocol (EIGRP) to Open Shortest Path First (OSPF)
  • CMigrate Hot Standby Router Protocol (HSRP) to Virtual Router Redundancy Protocol (VRRP)
  • DMigrate VLAN Trunking Protocol (VTP) to GARP VLAN Registration Protocol (GVRP)