nerdexam
HP

HP0-Y37 · Question #47

HP0-Y37 Question #47: Real Exam Question with Answer & Explanation

Sign in or unlock HP0-Y37 to reveal the answer and full explanation for question #47. The question stem and answer options stay visible for context.

Question

Click the Exhibit button and view a network diagram and a switch configuration. What happens when the 10 Gigabit Ethernet link 1/0/25 shown in the exhibit is disconnected from the HP A5800 switch IRF Member 5? (Select two.)

Options

  • AInterfaces on IRF Member 2 are placed in MAD shutdown.
  • BInterfaces on IRF Member 3 are placed in MAD shutdown.
  • CInterfaces on IRF Member 4 are placed in MAD shutdown.
  • DInterfaces on IRF Member 5 are placed in MAD shutdown.
  • EThe IRF split stack is NOT detected.
  • FNo interfaces are placed in MAD shutdown.

Unlock HP0-Y37 to see the answer

You've previewed enough free HP0-Y37 questions. Unlock HP0-Y37 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full HP0-Y37 Practice