HP
HP0-Y37 · Question #10
HP0-Y37 Question #10: Real Exam Question with Answer & Explanation
Sign in or unlock HP0-Y37 to reveal the answer and full explanation for question #10. The question stem and answer options stay visible for context.
Question
Click the Exhibit button. You are in the process of replacing Cisco switches at the distribution layer with HP E-Series switches. The migration will be running Multiple Spanning Tree Protocol (MSTP), and the Cisco switches will be running Rapid Per VLAN Spanning Tree Plus (Rapid PVST+). The exhibit displays the topology at this point. You have decided that you want the Cisco edge switches to block the redundant connection to the E-Series devices on their end rather than vice versa. Which actions meet this goal in the least disruptive way? (Select two.)
Options
- AConfigure MSTP on the edge switches, using the same region and version number as the HP E-Series switch; however leave Rapid PVST+ running on the Cisco distribution switches.
- BDisable Spanning Tree on the edge switches only for the duration of the migration.
- CConfigure the long path cost method on the Cisco switches.
- DLower the IST (instance 0) priority on one of the HP E-Series switch to 0.
- ESet the cost to 5000 on each port that connects the right HP E-Series switch and the left Cisco distribution switch.
Unlock HP0-Y37 to see the answer
You've previewed enough free HP0-Y37 questions. Unlock HP0-Y37 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.