You are planning an HP BladeSystem solution on a c7000 enclosure. In addition to the connectivity requirements shown in the picture. The customer wants to be able to configure additional network…

The correct answer is C. Procurve 5120G/XG modules in increment bays 1 and 2 and Brocades 8 GB SAN switches in bays 3. See the full explanation below for the reasoning.

Question

You are planning an HP BladeSystem solution on a c7000 enclosure. In addition to the connectivity requirements shown in the picture. The customer wants to be able to configure additional network connections with a speed of 2x10 GB LACP for each A5820 switch. Which incorrect module configuration can satisfy the customer's future expansion plans?

Options

  • AProcurve 5120G/XG modules in increment bays 1, 2, 5 and 6 Brocade 8 GB SAN switches in
  • BVirtual Connect Flex 10 modules in increment bays 1 and 2 and virtual connect 8 GB Fibre Channel
  • CProcurve 5120G/XG modules in increment bays 1 and 2 and Brocades 8 GB SAN switches in bays 3
  • DVirtual Connect FlexFabric modules in increment bays 1, 2, 3, and 4

How the community answered

(34 responses)
  • A
    6% (2)
  • B
    9% (3)
  • C
    82% (28)
  • D
    3% (1)