Question

A customer has an HP 10642 G2 Rack with Multiple DL2000 servers. The power connection to the rack is by two full length 7.36 kVA 32A single phase international PDUs with SNMP management module installed. As shown in the exhibit, the DL 170e servers in the DL2000 chassis are being blocked in by the PDU. What can be done to allow the DL 170e to be removed for servicing?

Exhibit

HP0-S33 question #36 exhibit

Options

  • AReplace the Existing PDUs with full length, 11kVA 16A 3Phase PDUs.
  • BReplace the existing PDUs with a modular PDU solution.
  • CReplace the existing PDUs with an iPDU Solution.
  • DMount the existing PDUs upside and feed the power from the top of the rack.