HP
HP0-J67 · Question #153
HP0-J67 Question #153: Real Exam Question with Answer & Explanation
Sign in or unlock HP0-J67 to reveal the answer and full explanation for question #153. The question stem and answer options stay visible for context.
Question
Scenario 3: A leading automotive technology company wants to increase the performance and capacity of the storage infrastructure that supports the design and manufacture of its line of Formula 1 racing cars. The company is also interested in safe-guarding its mission-critical data and eliminating the threat of business disruption. Due to the massive engineering and technical effort required to create a new race car design and to enable regular delivery of upgraded parts to the race track while maintaining a competitive edge, it is necessary to have advanced applications running on a high-performance IT infrastructure. The company operates out of two data centers. The centers support a Plant Lifecycle Management database, an Enterprise Resource Planning (ERP) system, and various trackside systems to set up the race car and aid race strategy. In addition, the centers run applications for Computer-Aided Design (CAD) Computer-Aided Manufacturing (CAM), and Computational Fluid Dynamics (CFD) packages. The company has deployed Oracle and SQL databases, VMware virtual machines, email, and all other applications on an HP 6400 Enterprise virtual Array (EVA). The EVAs automatically replicate between the two data centers to guard against failure. The EVAs are aging, applications are more sophisticated, data volumes have grown exponentiaily, and bottlenecks in the storage system are now having a sgnificant effect on the performance of the simulation and analysis tools that are vital to the company's competitive position. The data storage problem has reached a point where the company is forced to store primary data at the secondary site causing the loss of their disaster recovery capability. The company's top five IT Improvement goa's are: - Reduce compiaints about storage system availabiiity. - increase support for sophisticated design and manufacturing applications. - Provide a robust repication capability between data centers. - increase storage utilzation while depioying additional capacity. - Simplify operatons during peak workloads. Moreover, the company's top three business benefit goals are: - Ensure rapid data retrieval to aid in quick decision making. - Protect mission-critical data and ensure business continuity. - Recover costs from existing infrastructure, thus providing increased IT funds for additional projects. The company has asked that you create multiple solution proposals and prioritize one when you return for a presentation. Refer to the scenario. You are proposing an HP StoreOnce Backup System solution. Which tuning should be planned to performance and meet the customer business goals?
Options
- ASet up appendable pools.
- BConfigure multistreaming.
- CEnable multiplexing
- DDisable housekeeping.
Unlock HP0-J67 to see the answer
You've previewed enough free HP0-J67 questions. Unlock HP0-J67 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.