Question
Which steps must be taken when migrating from a cascaded topology to a core-edge topology? (Select two)
Options
- ACalculate the number of ports needed for the additional ISLs
- BRemove the cross-connected ISLs and leave the outer-connected ISLs
- CConnect required servers, storage devices, and core switches
- DRe-cable the ISLs to connect all edge switches to the core switches
- EConnect high-performance servers to both a core switch and an edge switch