HP
HP0-J65 · Question #84
Which steps must be taken when migrating from a cascaded topology to a core-edge topology? (Select two)
Sign in or unlock HP0-J65 to reveal the answer and full explanation for question #84. The question stem and answer options stay visible for context.
Optimizing Performance, Scalability, and Management for Enterprise Storage
Question
Which steps must be taken when migrating from a cascaded topology to a core-edge topology? (Select two)
Options
- ACalculate the number of ports needed for the additional ISLs
- BRemove the cross-connected ISLs and leave the outer-connected ISLs
- CConnect required servers, storage devices, and core switches
- DRe-cable the ISLs to connect all edge switches to the core switches
- EConnect high-performance servers to both a core switch and an edge switch
Unlock HP0-J65 to see the answer
You've previewed enough free HP0-J65 questions. Unlock HP0-J65 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
Topics
#core-edge topology#cascaded topology migration#ISL recabling#SAN topology design