HH0-340 · Question #26

You need to replace an existing system which is breaking a response time service level agreement. Which statement describes the most appropriate plan?

The correct answer is A. Build the new configuration capable of exceeding the IOPS rate of the current system during. See the full explanation below for the reasoning.

Question

You need to replace an existing system which is breaking a response time service level agreement. Which statement describes the most appropriate plan?

Options

  • ABuild the new configuration capable of exceeding the IOPS rate of the current system during
  • BBuild a configuration capable of matching the IOPS rate of the current system during the
  • CPropose a configuration capable of sustaining 70% of the peak IOPS measured in the
  • DBuild a configuration capable of matching the IOPS rate of the current system averaged over

How the community answered

(45 responses)
  • A
    80% (36)
  • B
    7% (3)
  • C
    11% (5)
  • D
    2% (1)