Which three steps should be performed during a new VSP installation? (Choose three.)

The correct answer is B. Set the battery date for each battery. D. Connect the CE laptop to the Console LAN connection port on the SVP. E. Dump the final configuration and upload it to TUF. See the full explanation below for the reasoning.

Question

Which three steps should be performed during a new VSP installation? (Choose three.)

Options

  • AInstall HiTrack Monitor on a customer server and configure it.
  • BSet the battery date for each battery.
  • CInstall all SSVP jumpers.
  • DConnect the CE laptop to the Console LAN connection port on the SVP.
  • EDump the final configuration and upload it to TUF.