Question
Before starting provisioning operations in Hitachi Device Manager, what are three requirements? (Choose three)
Options
- AThe host must be physically connected to the SAN.
- BThe port on the storage system must be configured.
- CAny world-wide node name (WWNN) must be configured for the host.
- DThe host must appear in the host view.
- EThe switch must be added to Device Manager.