The correct answer is A. The OLT upstream L3 core switch runs RRP, and MSP runs between the L dual stirrups and L3. D. The OLT upstream L3 Eucalyptus core switch cluster has the active and standby L connected to. See the full explanation below for the reasoning.
Question
When using Type B home networking, the mainstream application scenarios are (). (Multiple choice)
Options
- AThe OLT upstream L3 core switch runs RRP, and MSP runs between the L dual stirrups and L3.
- BThe L3 core switch for OLT upstream adopts clustering, and the L3 dual links are connected to the
- CThe upstream L3 core switch of OLT runs VRRP, OLT single homing, networking
- DThe OLT upstream L3 Eucalyptus core switch cluster has the active and standby L connected to