Before equipment commissioning, we need to check the hardware installation. What are the main items? (Multiple choice)

The correct answer is A. Check the standardization of cable layout B. Cabinet Installation Inspection C. Check the subrack D. Cabinet door installation inspection. See the full explanation below for the reasoning.

Question

Before equipment commissioning, we need to check the hardware installation. What are the main items? (Multiple choice)

Options

  • ACheck the standardization of cable layout
  • BCabinet Installation Inspection
  • CCheck the subrack
  • DCabinet door installation inspection

How the community answered

(30 responses)
  • A
    100% (30)