Regarding the bit error test of the entire network during commissioning, which of the following statements is correct? (Multiple choice)

The correct answer is A. In order to ensure the smooth passage of services on all channels in the entire network, a 10-minute bit C. During the single-channel bit error test, the remote end needs to perform a hardware loopback on the D. It is recommended that the number of OTU single boards or tributary boards connected in series should. See the full explanation below for the reasoning.

Question

Regarding the bit error test of the entire network during commissioning, which of the following statements is correct? (Multiple choice)

Options

  • AIn order to ensure the smooth passage of services on all channels in the entire network, a 10-minute bit
  • BThe duration of the full-channel bit error test is 20 hours. B If a bit error occurs within 20 hours, it needs
  • CDuring the single-channel bit error test, the remote end needs to perform a hardware loopback on the
  • DIt is recommended that the number of OTU single boards or tributary boards connected in series should

How the community answered

(32 responses)
  • A
    78% (25)
  • B
    22% (7)