In the process of equipment installation, which of the following statements are wrong?

The correct answer is C. In order to dissipate heat, the empty slots on the network element do not need to be inserted with filler. See the full explanation below for the reasoning.

Question

In the process of equipment installation, which of the following statements are wrong?

Options

  • AWear anti-static gloves or an anti-static wrist strap before touching the device, holding the plug-in board,
  • BInside the cabinet, the binding interval of the cable buckle/fiber binding band of the optical fiber shall not
  • CIn order to dissipate heat, the empty slots on the network element do not need to be inserted with filler
  • DWhen plugging and unplugging a single board with connecting cables or pigtails on the panel, unplug the

How the community answered

(37 responses)
  • A
    5% (2)
  • B
    8% (3)
  • C
    84% (31)
  • D
    3% (1)