H19-338_V3.0 · Question #31

How to test the failure of three controllers on a Dorado V6 mission-critical storage system with four controllers (SmartMatrix)?

The correct answer is B. Simulate the faults on any two controllers. After 5 minutes, simulate the fault on the third. See the full explanation below for the reasoning.

Huawei Storage Product Features and Portfolio

Question

How to test the failure of three controllers on a Dorado V6 mission-critical storage system with four controllers (SmartMatrix)?

Options

  • ASimulate the faults on three controllers at the same time
  • BSimulate the faults on any two controllers. After 5 minutes, simulate the fault on the third

How the community answered

(59 responses)
  • A
    20% (12)
  • B
    80% (47)

Topics

#SmartMatrix#controller failure#fault testing#Dorado V6