H13-629_V3.0 · Question #644

Which information is collected for project planning and design? (Multiple choice)

The correct answer is B. Storage Information C. Network information D. Host operating system version. Storage information (B), network information (C), and host operating system version (D) are all technical infrastructure details that must be gathered during project planning and design to understand the current environment, ensure compatibility, and define system requirements…

Storage Solution Planning and Design

Question

Which information is collected for project planning and design? (Multiple choice)

Options

  • AProject Amount
  • BStorage Information
  • CNetwork information
  • DHost operating system version

How the community answered

(44 responses)
  • A
    25% (11)
  • B
    75% (33)

Explanation

Storage information (B), network information (C), and host operating system version (D) are all technical infrastructure details that must be gathered during project planning and design to understand the current environment, ensure compatibility, and define system requirements accurately.

Why A is wrong: "Project Amount" is not a technical specification - it likely refers to budget or cost, which is a business/financial metric rather than the kind of environmental data collected for infrastructure planning and design.

Why B, C, D are correct: When scoping an IT project, teams need to know existing storage capacity and types (B), network topology and bandwidth (C), and OS versions (D) to assess compatibility, capacity gaps, licensing needs, and integration constraints.

Memory tip: Think "technical environment snapshot" - what does the existing infrastructure look like? Storage, network, and OS are all observable system properties. Budget and scope belong in the project charter, not the environment assessment.

Topics

#Storage Requirements#Network Infrastructure#System Configuration#Planning Phase