nerdexam
Huawei

H13-629_V3.0 · Question #615

A company purchased a set of Huawei hybrid flash storage to run virtualization platform services. Huawei multipath software was used on the host system and connected to the two controllers of the…

The correct answer is D. Disable the automatic LUN switching function of the multipath software and restore the failed link as. See the full explanation below for the reasoning.

Storage O&M and Troubleshooting

Question

A company purchased a set of Huawei hybrid flash storage to run virtualization platform services. Huawei multipath software was used on the host system and connected to the two controllers of the storage through an Ethernet switch. The storage engineer found that the host-side service was interrupted and delayed. After inspection, it was found that the active link of the multipath kept switching. While ensuring business reliability, which of the following operations can solve this problem?

Options

  • AUninstall the multipath software and disable the system's built-in multipath function.
  • BEach host uses only one Ethernet port to connect directly to the storage
  • CRestart the storage controller and disable automatic switching after controller failure
  • DDisable the automatic LUN switching function of the multipath software and restore the failed link as

How the community answered

(45 responses)
  • A
    7% (3)
  • B
    9% (4)
  • C
    2% (1)
  • D
    82% (37)

Topics

#multipath software#link switching#LUN auto-switching#troubleshooting

Community Discussion

No community discussion yet for this question.

Full H13-629_V3.0 Practice