A company purchased two sets of Huawei all-flash storage devices and planned to configure active- active disaster recovery: Engineer A is responsible for the specific operation and configuration…

The correct answer is B. Configure redundant links between storage networks C. When configuring zones on fiber switches, configure based on the principle of minimization D. Configure two arbitration servers at the arbitration site to form a dual arbitration network. See the full explanation below for the reasoning.

Data Protection and Business Continuity Solution Design

Question

A company purchased two sets of Huawei all-flash storage devices and planned to configure active- active disaster recovery: Engineer A is responsible for the specific operation and configuration. Which of the following operations meet the scenario requirements? (Multiple choice)

Options

  • AThe arbitration server is connected to the storage via the fiber optic protocol
  • BConfigure redundant links between storage networks
  • CWhen configuring zones on fiber switches, configure based on the principle of minimization
  • DConfigure two arbitration servers at the arbitration site to form a dual arbitration network

How the community answered

(41 responses)
  • A
    27% (11)
  • B
    73% (30)

Topics

#active-active disaster recovery#arbitration server#fiber channel zoning#storage HA design