A certain Huawei Oceanstor 9000 cluster period uses back-end 10GE networking. After the networking and wiring are completed, do the following configurations for the 10GE switch? (Multiple choice)
The correct answer is A. Configure two switch stacks B. Configure the switch flow control switch C. Configure switch management IP. See the full explanation below for the reasoning.
Question
A certain Huawei Oceanstor 9000 cluster period uses back-end 10GE networking. After the networking and wiring are completed, do the following configurations for the 10GE switch? (Multiple choice)
Options
- AConfigure two switch stacks
- BConfigure the switch flow control switch
- CConfigure switch management IP
How the community answered
(52 responses)- A100% (52)