H13-624_V5.0 · Question #367

After testing, the bandwidth of the two data centers of the customer is 155Mbit/s, the peak write bandwidth of an application is 9.8MB/s, the average write bandwidth is 300KB/s, the average write…

The correct answer is D. It is feasible because the conditions meet the requirements of the master-slave synchronous. See the full explanation below for the reasoning.

Question

After testing, the bandwidth of the two data centers of the customer is 155Mbit/s, the peak write bandwidth of an application is 9.8MB/s, the average write bandwidth is 300KB/s, the average write I/O size is 4KB, and the bandwidth utilization rate is 70%, my colleague chooses the active- standby synchronous remote replication disaster recovery solution, the solution:

Options

  • ANot feasible, the calculated bandwidth requires 200Mbit/s.
  • BNot feasible, the master-slave synchronous remote replication disaster recovery solution requires
  • CNot feasible, the active-standby synchronous remote replication disaster recovery solution
  • DIt is feasible because the conditions meet the requirements of the master-slave synchronous

How the community answered

(54 responses)
  • A
    2% (1)
  • B
    6% (3)
  • C
    9% (5)
  • D
    83% (45)