Question
If the technical migration actions performed on the network will affect the existing network operations, the pre-set operating procedures and risk control measures must be strictly followed when implementing the technical migration project. Such projects are generally defined as cutover projects. Which of the following operations performed in the existing network is a non-cutover item?
Options
- AChange the level of IS-IS Level 1-1-2 routers to Level 1-1 in batches
- BModify the description information of router interfaces in batches
- CChange the area type of some OSPF routers to Stub area in batches
- DChange the method of importing routes into BGP in batches from network to import