nerdexam
Huawei

H12-725_V4.0 · Question #14

Which of the following descriptions about deploying a firewall virtual system is incorrect?

The correct answer is C. Configure the resource class first, and then enable the virtual system for binding. Option C is marked as the incorrect description because it reverses the proper deployment sequence - the correct procedure is to first enable the virtual system, then configure and bind a resource class to it, not the other way around. You cannot bind a resource class to a…

Firewall Technologies and Deployment

Question

Which of the following descriptions about deploying a firewall virtual system is incorrect?

Options

  • AA resource class can be bound to multiple virtual systems at the same time
  • BYou can view the created virtual systems and allocated resources in the "Virtual System List"
  • CConfigure the resource class first, and then enable the virtual system for binding
  • DResource class r0 is bound to the root system by default and cannot be deleted or modified.

How the community answered

(53 responses)
  • A
    2% (1)
  • B
    6% (3)
  • C
    83% (44)
  • D
    9% (5)

Explanation

Option C is marked as the incorrect description because it reverses the proper deployment sequence - the correct procedure is to first enable the virtual system, then configure and bind a resource class to it, not the other way around. You cannot bind a resource class to a virtual system that hasn't been enabled yet.

Why the distractors are accurate (and thus not the answer):

  • A is true: a single resource class can be shared across multiple virtual systems simultaneously, allowing flexible resource allocation.
  • B is true: the Virtual System List interface does display both created virtual systems and their allocated resource details.
  • D is true: resource class r0 is the default, pre-bound to the root system, and is protected - it cannot be deleted or modified by administrators.

Memory tip: Think of it like renting an apartment - you must first create (enable) the apartment (virtual system) before you can assign a lease plan (resource class) to it. C has the tenant moving in before the building exists.

Topics

#virtual system#resource class#VSYS#firewall virtualization

Community Discussion

No community discussion yet for this question.

Full H12-725_V4.0 Practice