Huawei
H12-425_V2.0 · Question #471
In operant conditioning, the subject is free to make responses at any time, So conditioning is measured by the rate of responding. In most other Ways, however, their forms of learning are…
The correct answer is D. When the UPS is overloaded, the loads connected to the sL terminal will be powered off first to ensure. See the full explanation below for the reasoning.
Question
In operant conditioning, the subject is free to make responses at any time, So conditioning is measured by the rate of responding. In most other Ways, however, their forms of learning are essentially the same.
Options
- AWhen UPSs are connected in parallel, connect loads to the pL terminal.
- BWhen a single UPS works and loads are of the same importance, connect all loads to the sL terminal.
- CWhen a single UPS works and loads are divided into two levels, connect the primary load to the sL
- DWhen the UPS is overloaded, the loads connected to the sL terminal will be powered off first to ensure
How the community answered
(34 responses)- A3% (1)
- B3% (1)
- C9% (3)
- D85% (29)
Community Discussion
No community discussion yet for this question.