To configure the UPS system plan, which of the following factors need to be considered in the plan? (Multiple choice)

Options

  • AMake and model of AC and DC cables
  • BUPS model, capacity and parallel mode
  • CThe brand and capacity of the battery
  • DConfiguration of battery rack and battery switch box