Question
After the UPS5000-E is installed, what are the key points for the first power-on inspection? (Multiple choice)
Options
- AWhether the mechanical installation and cable installation are tight
- BInput and output without short circuit
- CAC input phase sequence is correct
- DBattery wiring is correct