Question

If the customer's load cannot be powered off, what should be paid attention to disconnecting the maintenance bypass switch after the maintenance is completed?

Options

  • AThe circuit module is normal and can supply power
  • BThe maintenance bypass switch can also be disconnected when the bypass module is abnormal
  • CEPO filling can break the maintenance switch
  • DThe battery input is normal

Unlock H12-425_V2.0 to see the answer