H12-425_V2.0 · Question #122

If a project requires the management system to be connected to a third-party generator set, two smart meters 1 (same model), and two precision air conditioners (same model), the management system…

The correct answer is B. 3. See the full explanation below for the reasoning.

Question

If a project requires the management system to be connected to a third-party generator set, two smart meters 1 (same model), and two precision air conditioners (same model), the management system needs to report () a third-party equipment access fee?

Options

  • A1
  • B3
  • C5
  • DNone of the above is true

How the community answered

(43 responses)
  • A
    2% (1)
  • B
    79% (34)
  • C
    12% (5)
  • D
    7% (3)