In the power supply and distribution system of the data center, if a power outage occurs, the backup switching between AC power and AC power or between AC power and diesel generator is generally completed by ().
Options
- AAutomatic transfer switch system
- BDiesel generator system
- CLow voltage power distribution system
- DRack power distribution system