The total current of the battery pack is 1000A, and 3 sets of batteries are configured. Which is the most economical configuration of the cable from the UPS to the main switch box?

The correct answer is B. 150mm^2 (441A) ?3. See the full explanation below for the reasoning.

Question

The total current of the battery pack is 1000A, and 3 sets of batteries are configured. Which is the most economical configuration of the cable from the UPS to the main switch box?

Options

  • A120mm^2 (382A) ?3
  • B150mm^2 (441A) ?3
  • C185mm^2 (506A) ?3
  • D240mm^2 (599A) ?3

How the community answered

(39 responses)
  • A
    3% (1)
  • B
    74% (29)
  • C
    5% (2)
  • D
    18% (7)

Community Discussion

No community discussion yet for this question.