GSNA · Question #71

Which of the following is a prevention-driven activity to reduce errors in the project and to help the project meet its requirements?

The correct answer is D. Quality assurance. Quality assurance is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements. It is a prevention- driven activity to reduce errors in the project and to help the project meet its requirements…

Audit Fundamentals & Planning

Question

Which of the following is a prevention-driven activity to reduce errors in the project and to help the project meet its requirements?

Options

  • AAudit sampling
  • BAsset management
  • CAccess control
  • DQuality assurance

How the community answered

(34 responses)
  • A
    3% (1)
  • B
    9% (3)
  • C
    3% (1)
  • D
    85% (29)

Explanation

Quality assurance is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements. It is a prevention- driven activity to reduce errors in the project and to help the project meet its requirements. Answer: A is incorrect. Audit sampling is an application of the audit procedure that enables the IT auditor to evaluate audit evidence within a class of transactions for the purpose of forming a conclusion concerning the population. When designing the size and structure of an audit sample, the IT auditor should consider the audit objectives determined when planning the audit, the nature of the population, and the sampling and selection methods. Answer: C is incorrect. The process of limiting access to the resources of a Web site is called access control. Access control can be performed in the following ways: Registering the user in order to access the resources of the Web site. This can be confirmed by the user name and password. Limiting the time during which resources of the Web site can be used. For example, the Web site can be viewed between certain hours of a day. Answer: B is incorrect. It is the practice of managing the whole life cycle (design, construction, commissioning, operating, maintaining, repairing, modifying, replacing and decommissioning/disposal) of physical and infrastructure assets such as structures, production, distribution networks, transport systems, buildings, and other physical assets.