Dell-EMC
E20-885 · Question #2
A customer has two EMC VNX configured to replicate between sites. Each VNX has dual Control Stations. The primary Control Station at the source site fails at 6 p.m. and reboots. At 8 p.m., the…
The correct answer is A. The control station of the primary VNX should have been failed back. See the full explanation below for the reasoning.
Question
A customer has two EMC VNX configured to replicate between sites. Each VNX has dual Control Stations. The primary Control Station at the source site fails at 6 p.m. and reboots. At 8 p.m., the customer completes DR testing and observes CIFS replication does not failover to the target site VNX. Why does CIFS replication not failover to the target VNX during the DR test?
Options
- AThe control station of the primary VNX should have been failed back.
- BThe control station of the second VNX should have been failed over.
- CThe control station of the primary VNX should have IP bounding enabled.
- DThe control station of the secondary VNX should have IP bounding enabled.
How the community answered
(22 responses)- A82% (18)
- B5% (1)
- C5% (1)
- D9% (2)
Community Discussion
No community discussion yet for this question.