Refer to the exhibit. An SRDF/Star configuration has production running at Site A. A symstar halt command is executed at the workload site (Site A). Which action would reconfigure the RDF device…
The correct answer is A. A switch action. See the full explanation below for the reasoning.
Question
Refer to the exhibit. An SRDF/Star configuration has production running at Site A. A symstar halt command is executed at the workload site (Site A). Which action would reconfigure the RDF device relationships such that the workload site is located at Site B and both RDF targets are in the disconnected state?
Exhibit
Options
- AA switch action
- BA connect action
- CAn enable action
- DA reconfigure action
How the community answered
(28 responses)- A71% (20)
- B11% (3)
- C14% (4)
- D4% (1)