Refer to the exhibit. An SRDF/Star configuration has production running at Site A. A symstar halt command is executed at the workload site (Site A). Which action would reconfigure the RDF device…

The correct answer is A. A switch action. See the full explanation below for the reasoning.

Question

Refer to the exhibit. An SRDF/Star configuration has production running at Site A. A symstar halt command is executed at the workload site (Site A). Which action would reconfigure the RDF device relationships such that the workload site is located at Site B and both RDF targets are in the disconnected state?

Exhibit

E20-816 question #84 exhibit

Options

  • AA switch action
  • BA connect action
  • CAn enable action
  • DA reconfigure action

How the community answered

(28 responses)
  • A
    71% (20)
  • B
    11% (3)
  • C
    14% (4)
  • D
    4% (1)