Dell-EMC
E20-816 · Question #137
E20-816 Question #137: Real Exam Question with Answer & Explanation
Sign in or unlock E20-816 to reveal the answer and full explanation for question #137. The question stem and answer options stay visible for context.
Question
Refer to the exhibit. A composite group spanning two Symmetrix arrays is set up to run SRDF/Star using Cascaded SRDF as illustrated in the exhibit. Which condition must be met before an MSC cycle switch is performed at site B?
Options
- ASDDF bitmaps have been swapped at Site A
- BInvalid track count between Sites A and C must be under 30000
- CSYMCLI_STAR_ALLOW_CASCADED_CONFIGURATION option must be enabled in the
- DTransmission of delta sets from Site B to C has finished
Unlock E20-816 to see the answer
You've previewed enough free E20-816 questions. Unlock E20-816 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.