An EMC service engineer is tasked with installing a VNX Block storage system with an SPE. After a period of 10 minutes, SP A has booted successfully and SP B's status LED is still flashing amber. The service engineer verifies that the cabling is correct. What is one explanation for why SP B will not boot?

Options

  • AThe top LCC in DAE 0 is faulted
  • BI/O module 1 in the right SP is faulted
  • CThe bottom LCC in DAE 0 is faulted
  • DI/O module 1 in the left SP is faulted