An operator must shut down the standby Control Station CS1 on a VNX configured with dual Control Stations. What action, if any, does the operator need to take to allow management and monitoring of…
The correct answer is B. No action required; CS0 continues to operate with the primary Control Station role. The standby Control Station, also known as Control Station 1, or CS1, provides a redundant capability if the primary Control Station fails. For the standby Control Station to work, both Control Stations must be fully configured and operational. The standbyControl Station is an…
Question
An operator must shut down the standby Control Station CS1 on a VNX configured with dual Control Stations. What action, if any, does the operator need to take to allow management and monitoring of the VNX to continue when CS1 is offline?
Options
- AThe operator needs to manually run the cs_standby command for the standby Control Station
- BNo action required; CS0 continues to operate with the primary Control Station role.
- CThe operator needs to manually run the cs_standby command to shut down the standby
- DNo action is required; management and monitoring functions are not provided to the Celerra
How the community answered
(19 responses)- A5% (1)
- B68% (13)
- C16% (3)
- D11% (2)
Explanation
The standby Control Station, also known as Control Station 1, or CS1, provides a redundant capability if the primary Control Station fails. For the standby Control Station to work, both Control Stations must be fully configured and operational. The standbyControl Station is an optional component of the VNX