Dell-EMC
E20-690 · Question #28
A customer engineer (CE) has successfully powered up a factory-installed VNX Unified storage system. The CE now needs to configure the Control Station for network access. What is required of the PC…
Sign in or unlock E20-690 to reveal the answer and full explanation for question #28. The question stem and answer options stay visible for context.
Question
A customer engineer (CE) has successfully powered up a factory-installed VNX Unified storage system. The CE now needs to configure the Control Station for network access. What is required of the PC running the VIA to successfully discover the Control Station?
Options
- AIt must be on the same subnet as the Control Station.
- BIt must have a serial connection to the Control Station.
- CIt must be able to ping the Control Station before configuration.
- DIt must use the Control Station's hostname to make the initial connection.
Unlock E20-690 to see the answer
You've previewed enough free E20-690 questions. Unlock E20-690 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.