Dell-EMC
E20-690 · Question #2
An engineer is installing a VNX Block system with two SPSs, a DPE, and two optional DAEs. After connecting the SPSs, which ports on the DPE would the engineer use to install the first DAE and the…
The correct answer is A. SAS port 1 from the DPE to the first DAE. See the full explanation below for the reasoning.
Question
An engineer is installing a VNX Block system with two SPSs, a DPE, and two optional DAEs. After connecting the SPSs, which ports on the DPE would the engineer use to install the first DAE and the second DAE?
Options
- ASAS port 1 from the DPE to the first DAE.
- BSAS port 0 from the DPE to the first DAE.
- CSAS port 1 from the DPE to the first DAE.
- DSAS port 0 from the DPE to the first DAE.
How the community answered
(31 responses)- A81% (25)
- B6% (2)
- C10% (3)
- D3% (1)
Community Discussion
No community discussion yet for this question.