E20-616 · Question #215
Click the exhibit button. An existing DMX SRDF configuration had a failure at the Workload site. Which recovery step needs to be performed to prepare to re-start applications at the alternate site?
The correct answer is B. Differential synchronization from the SRDF/S site to the SRDF/A. See the full explanation below for the reasoning.
Question
Click the exhibit button. An existing DMX SRDF configuration had a failure at the Workload site. Which recovery step needs to be performed to prepare to re-start applications at the alternate site?
Exhibit
Options
- ADifferential synchronization from the SRDF/A site to the SRDF/S
- BDifferential synchronization from the SRDF/S site to the SRDF/A
- CFull synchronization from the SRDF/A site to the SRDF/S
- DFull synchronization from the SRDF/S site to the SRDF/A
How the community answered
(51 responses)- A6% (3)
- B80% (41)
- C12% (6)
- D2% (1)