When is Engineering Mode used to perform a Non-Disruptive Upgrade (NDU)?

The correct answer is D. To bypass failed rules. See the full explanation below for the reasoning.

Question

When is Engineering Mode used to perform a Non-Disruptive Upgrade (NDU)?

Options

  • ATo disable Write cache
  • BTo disable AccessLogix
  • CTo perform pre-checks
  • DTo bypass failed rules

How the community answered

(25 responses)
  • A
    4% (1)
  • B
    8% (2)
  • C
    4% (1)
  • D
    84% (21)