Dell-EMC
E20-591 · Question #235
E20-591 Question #235: Real Exam Question with Answer & Explanation
Sign in or unlock E20-591 to reveal the answer and full explanation for question #235. The question stem and answer options stay visible for context.
Question
An EMC Avamar backup administrator must configure root-to-root Disaster Recovery (DR) replication from two single-node servers to a single, larger multi-node server, and is asking for DR methods in the event of a failure of one of the single-node servers. What advice do you give this administrator to protect the data on the single-node servers?
Options
- AThe DR full copy replication method is one-to-one, so the administrator will either need a target
- BThe multi-node server can accept DR full copy from both single-node servers, but can only stand
- CThe standard bi-directional replication method between the single-nodes and the multi-node will
- DA third single-node will need to be purchased and dedicated to both of the existing single-nodes
Unlock E20-591 to see the answer
You've previewed enough free E20-591 questions. Unlock E20-591 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.