A storage administrator has a disaster recovery solution that synchronously replicates a LUN from a Site A production Unity system to a destination Unity at Site B. Site A experiences an unexpected…
The correct answer is B. Failover from the Site B Unity after the outage event Resume from Site A after Site A is recovered. See the full explanation below for the reasoning.
Question
A storage administrator has a disaster recovery solution that synchronously replicates a LUN from a Site A production Unity system to a destination Unity at Site B. Site A experiences an unexpected outage. Which options would be performed to provide data access during the outage windows and return production to site A after the outage
Options
- AFailover from the Site B Unity after the outage event Resume from Site B after Site A is recovered
- BFailover from the Site B Unity after the outage event Resume from Site A after Site A is recovered
- CFailover from the Site B Unity after the outage event Resume from Site a after Site A is recovered
- DFailover from the Site B Unity after the outage event Resume (rom Site B after Site A is recovered
How the community answered
(26 responses)- A4% (1)
- B77% (20)
- C15% (4)
- D4% (1)