Question

You are installing an EMC Data Domain system with two expansion shelves in a customer- provided rack. When cabling the controller to the shelves, where does the host port on the last shelf in the chain get connected?

Options

  • AExpansion port of the upstream shelf
  • BExpansion port of the controller
  • CLast port is left un-cabled
  • DHost port of the controller