Dell-EMC
E20-377 · Question #34
E20-377 Question #34: Real Exam Question with Answer & Explanation
Sign in or unlock E20-377 to reveal the answer and full explanation for question #34. The question stem and answer options stay visible for context.
Question
Refer to the Exhibit. A customer has been testing emergency operations in case of a site failure. They notice that the Win_CG consistency group (CG) is out-of-sync between the production and disaster recovery sites. What happened to cause the consistency group to be out-of-sync?
Options
- AProduction LUN is in the process of rolling back after the test was completed
- BRPA cannot destage all data within the Required Protection Window
- CProduction LUN has failed to roll back and is now in Marking mode
- DCG is now in a Long Resync to destage changes from the production LUN
Unlock E20-377 to see the answer
You've previewed enough free E20-377 questions. Unlock E20-377 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.