Dell-EMC
E20-324 · Question #25
E20-324 Question #25: Real Exam Question with Answer & Explanation
Sign in or unlock E20-324 to reveal the answer and full explanation for question #25. The question stem and answer options stay visible for context.
Question
Refer to the exhibit. While trying to maximize availability for CIFS clients, the customer has designed the following 10 Gb/s IP environment. What would you change in this design?
Exhibit
Options
- AEnsure every connection has a failover to another switch.
- BTwo Nexus switches are needed and the connection to the third switch removed.
- Cand d) and e)
- DChange from LACP to EtherChannel for higher performance.
- EUpgrade to a VNX7500 to provide additional Data Movers.
- Fa) and b)
- Ga) and b) and c)
- Hb) and d)
Unlock E20-324 to see the answer
You've previewed enough free E20-324 questions. Unlock E20-324 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.
