DP-600 · Question #68
You have an Azure Repos repository named Repo1 and a Fabric-enabled Microsoft Power BI Premium capacity. The capacity contains two workspaces named Workspace1 and Workspace2. Git integration is enable
The correct answer is A. PBIP. Power BI Desktop introduces a new way to author, collaborate, and save your projects. When you save your work as a Power BI Project (PBIP), report and semantic model item definitions are saved as individual plain text files in a simple, intuitive folder structure. https://learn.m
Question
You have an Azure Repos repository named Repo1 and a Fabric-enabled Microsoft Power BI Premium capacity. The capacity contains two workspaces named Workspace1 and Workspace2. Git integration is enabled at the workspace level. You plan to use Microsoft Power BI Desktop and Workspace1 to make version-controlled changes to a semantic model stored in Repo1. The changes will be built and deployed to Workspace2 by using Azure Pipelines. You need to ensure that report and semantic model definitions are saved as individual text files in a folder hierarchy. The solution must minimize development and maintenance effort. In which file format should you save the changes?
Options
- APBIP
- BPBIDS
- CPBIT
- DPBIX
How the community answered
(20 responses)- A85% (17)
- B5% (1)
- D10% (2)
Explanation
Power BI Desktop introduces a new way to author, collaborate, and save your projects. When you save your work as a Power BI Project (PBIP), report and semantic model item definitions are saved as individual plain text files in a simple, intuitive folder structure. https://learn.microsoft.com/en-us/power-bi/developer/projects/projects-overview