Dell-EMC
DES-6322 · Question #43
An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?
The correct answer is C. Power distribution must support the power rating of a single node. See the full explanation below for the reasoning.
Question
An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?
Options
- AService laptop must be on the same IP network as the iDRACs
- BAt least 36 in (92 cm) clearance exists in front of and behind the cabinet
- CPower distribution must support the power rating of a single node
- DSingle power zone must be used with adequate power cables
How the community answered
(30 responses)- A3% (1)
- B13% (4)
- C77% (23)
- D7% (2)
Community Discussion