A VxRail D560 cluster was delivered six months ago and now needs to be prepared for installation with the target code. What is the correct method to complete the task?

Options

  • ABoot into RASR ISO and perform a RASR Reset
  • BBoot into RASR USB and perform a RASR Reset
  • CBoot into SD card and perform a Factory Reset
  • DBoot into RASR ISO and perform a Factory Reset

Unlock DES-6322 to see the answer