Question

How many cables are required to install a 4 node VxRail Model G410 cluster with 1 GbE into a rack?

Options

  • A4 CAT6 and 16 Twinax network cables
  • B4 CAT6 and 32 SFP+ connectors, and 16 fiber cables
  • C4 CAT6 and 8 Twinax network cables
  • D20 CAT6 network cables

Unlock DES-6321 to see the answer

You've previewed enough free DES-6321 questions. Unlock DES-6321 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full DES-6321 Practice