nerdexam
Dell-EMC

DES-5121 · Question #39

DES-5121 Question #39: Real Exam Question with Answer & Explanation

Sign in or unlock DES-5121 to reveal the answer and full explanation for question #39. The question stem and answer options stay visible for context.

Question

A Master switch failed in a Dell EMC N-Series three-unit switch stack and the Standby switch assumed the role of Master. What happens when the failed Master switch rejoins the stack after the new Master has taken over?

Options

  • ASwitch joins the stack as the Standby
  • BSwitch does not have to be rebooted to rejoin the stack
  • CSwitch joins the stack as a Member
  • DSwitch joins the stack and resumes as the Master

Unlock DES-5121 to see the answer

You've previewed enough free DES-5121 questions. Unlock DES-5121 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full DES-5121 Practice