A server has two power supply unites (PSUs) m a redundant configuration. One PSU fails. A technician replaces the failed PSU, but the server does not return to redundant power mode. What is the cause of this issue?
Options
- APower redundant option is disabled in the System Setup Utility
- BServer has not been power cycled to bring the now PSU online
- CBoth PSUs were not replaced at the same lime
- DNow PSU has a different wattage than the existing PSU